Purpose of Satunaigawa Dam

Maintenance of River Discharge

 Satsunaigawa Dam proved its ability to prevent flooding caused by heavy rain in August 1997 when the dam was in the flooding test stage. About 640m3/s of water accumulated, of which 80m3/s was discharged and 560m3/s was retained. The maximum flow of water downstream of the dam at Nantaibashi Bridge was about 600m3/s. Without the dam, the flow of water would have been about 1,000m3/s, more than the all-time high recorded during a flood in August 1981. This experience showed that the Satsunaigawa Dam prevents flooding and protects areas along the upper and midstream sections of the Satsunaigawa River.
  • Maintenance of River Discharge

お問合せ先

帯広河川事務所

  • 住所:北海道中川郡幕別町札内西町73番地6
  • 電話番号:0155-25-1294

現在位置の階層

  1. トップページ
  2. 帯広河川事務所
  3. Satunaigawa Dam web site(Purpose of Satunaigawa Dam - Maintenance of River Discharge)