Kuchoro Sediment Retention Basin

Restoration Site 3 : Kuchoro Sediment Retention Basin

A sediment reduction measure has been implemented in another tributary.

p1

Sediment control areas have been established on both banks of the Kuchoro River, a tributary of the Kushiro River. The site is located at the edge of the wetland and helps reduce sediment inflow into the wetland.

p1

The sediment control areas on both banks cover a total of about 60 hectares. Low walls were constructed to enclose the areas. During floods, water overflows the banks and is temporarily stored within these areas. The settling of suspended sediment in these areas helps reduce sediment inflow into the wetland.

p1 p1


A large volume of sediment was effectively trapped at the site during the major flood in 2016.

p1

Kushiro Wetland Restoration Project

Kushiro Wetland

Wetland Restoration
Restoration Site 1 : Kayanuma, Old Channel Restoration 1
Restoration Site 2 : Numaoro, Old Channel Restoration 2
Restoration Site 3 : Kuchoro, Sediment Retention Basin
Restoration Site 4 : Hororo, Reconversion of Farmland into Wetlands
Kushiro Wetland Nature Restoration Council

Project Goals
Sediment reduction flowing into the wetland
Implovement of habitat for fish
Restoring Wetland Vegetation

History 1 : Wetland Development
History 2 : Shift Toward Wetland Conservation and Restoration
Peatland


Copyright Kushiro Wetland Restoration Project. All Rights Reserved.

お問合せ先

釧路湿原自然再生協議会運営事務局

  • 電話番号:0154-23-1353

現在位置の階層

  1. トップページ
  2. 治水課
  3. 釧路湿原自然再生協議会 トップページ
  4. Kuchoro Sediment Retention Basin