3 Regeneration of the mire
ページ内目次
Proposal for Conservationof the River Environment in Kushiro Mire
Ⅲ Measures to meet the targets
3 Regeneration of the mire
The restoration of marshland should be conducted on unused land around the mire.
[Specific measures]
Marshland should be restored by re-establishing groundwater levels. Specifically, restoration should be conducted in the Hororo River area and Kayanuma area on the main stream of the Kushiro River, where the unused land measures about 300 ha. With a five-year target, marshland in the Kayanuma area should be restored, then on the basis of the results of that area, marshland in the Hororo River area should be restored.
It is important to consider the influence of the restoration on the surrounding agricultural land and to predict it as accurately as possible.
[Specific measures]
Marshland should be restored by re-establishing groundwater levels. Specifically, restoration should be conducted in the Hororo River area and Kayanuma area on the main stream of the Kushiro River, where the unused land measures about 300 ha. With a five-year target, marshland in the Kayanuma area should be restored, then on the basis of the results of that area, marshland in the Hororo River area should be restored.
It is important to consider the influence of the restoration on the surrounding agricultural land and to predict it as accurately as possible.
- Illustration of the measures(Hororo River area)
- Illustration of the measures(Kayanuma area)